Bldg-E 3rd Floor Terrace Planters with Soil in Place - Jan2010

  • Bldg-E 3rd Floor Terrace Planters with Soil in Place - Jan2010 image
  • Nimitz Avenue, Building D’s Lobby Entrance Road & East Parking Curb - Jan2010 image
  • Bldg-E Terrace Garden Sun Screen Installation - Jan2010 image
  • Building B’s Stairway #4 - Jan2010 image
  • MacArthur Avenue Curb, Gutter and Sidewalk - Jan2010 image
  • East Parking Lot Grading, Underground Electrical & Curb Construction - Jan2010 image
  • Boxed Trees Delivered to Site for Planting - Jan2010 image
  • Building B’s Lobby & Reception Desk - Jan2010 image
  • Bldg-E 3rd Floor Terrace & Planter - Dec2009 image
  • Northwest of Bldg-A Site Irrigation - Dec2009 image
  • Bldg's D & C Exterior from Gorham Entrance into Building Parking Lot - Dec2009 image
  • Nimitz Avenue & East Parking Lot Grading - Dec2009 image
  • Bldg-D Lobby Entrance Hardscape - Dec2009 image
  • MacArthur & Nimitz Corner Curb, Gutter & Hardscape - Dec2009 image
  • Bldg’s D & E Exterior from Gorham Entrance into Building Parking Lot - Dec2009 image
  • Bldg- B to A First Floor Corridor Finishes - Dec2009 image
  • East Parking Lot Demo for Grading - Nov2009 image
  • Asphalt Paving at GLA-VA Bldg-337, Gorham & Southwest Parking Lot - Nov2009 image
  • Fire Access Road Curb Paving and Fence West of Brentwood Theater - Nov2009 image
  • Bldg-E Garden Terrace Water Proofing Membrane - Nov2009 image
  • Fire Access Road Asphalt Paving & Fence on West Side of Building - Nov2009 image
  • Construction Hardscape at North Side of Bldg-D - Nov2009 image
  • Bldg-A Elevator Mechanical Room - Nov2009 image
  • Bldg-D Barber Shop Room Finishes - Nov2009 image
  • Bldg-D Kitchen Tile & Equipment - Oct2009 image
  • Bldg-D Lobby North Exterior Stucco Complete - Oct2009 image
  • Fire Access Road Curb & Base and Fence North of Brentwood Theater - Oct2009 image
  • Gorham Avenue Curb and Grading for Asphalt - Oct2009 image
  • Concrete Walkway, Access Road Curb & Gutter on West Side of Bldg-C - Oct2009 image
  • Concrete Walkways on East Side of Bldg-A - Oct2009 image
  • Bldg-F Southwest Parking Lot Curbs & Base - Oct2009 image
  • Bldg-E Third Floor Carpet Installation - Oct2009 image
  • Monument Sign & Flag Pole Footings on Nimitz Avenue - Sep2009 image
  • Site Development:  Concrete Walkway on West Side of Bldg “C” - Sep2009 image
  • South Exterior View of Bldg’s “C” & “D” from Gorham Avenue Entrance - Sep2009 image
  • Sheathing & Window Close-up of Manlift & Seismic Joint at Bldg “D” - Sep2009 image
  • Bldg “D’s”:  Kitchen Tile - Sep2009 image
  • Interior Finish of Seismic Joint between Bldg’s “A&B” - Sep2009 image
  • South Exterior View of Bldg’s “D” & “E” from Gorham Avenue Entrance - Sep2009 image
  • Site Development:  Gorham/Brigham Avenues Parking Lot Curb & Gutter - Sep2009 image
  • Nimitz Avenue Closure for Street Improvements - Aug2009 image
  • Site Development: MacArthur Ave & Bldg “A” Stairs & Retaining Walls - Aug2009 image
  • Bldg “F”: Water Boilers for the Building Structure’s Hot Water - Aug2009 image
  • Bldg “D” Construction Manlift & Seismic Joint at Bldgs “D&E” - Aug2009 image
  • Bldg “A’s”: Nurse’s Station - Aug2009 image
  • Finished Seismic Joint at Bldg’s “A&B” - Aug2009 image
  • Bldg “F”:  Cooling Tower for the Building Structure’s A/C Chilled Water - Aug2009 image
  • Bldg “C” Whirlpool Room & Tub - Aug2009 image
  • Buildings “C, D & E” North Side Exterior - Jul2009 image
  • Fire Access Road Rough Grade behind Brentwood Theater - Jul2009 image
  • Bldgs “F, C & D” South Side Exterior from Bringham/Gorham Corner - Jul2009 image
  • Building “E” South Side Garden Terrace Exterior Sheathing - Jul2009 image
  • Site Development / Bldg “A” Storm Drain Sediment Filtration Unit Excavation - Jul2009 image
  • Site Development Bldg “D” Loading Dock Ramp Concrete Placement - Jul2009 image
  • Buildings “D & E” South Side Exterior from Bringham/Gorham Corner - Jul2009 image
  • Building “C” 1st Floor Corridor Carpet - Jul2009 image
  • Building “E” South Side Garden Terrace GFRC Erection Completed - Jun2009 image
  • MacArthur Ave Stairway & Retaining Wall Construction - Jun2009 image
  • Building “C&D” South Side Exterior - Jun2009 image
  • Building “E” Corridor Paint - Jun2009 image
  • Building “D” North Exterior Stucco Finish & Manlift - Jun2009 image
  • Building “A&B” West Seismic Joint #11 Construction - Jun2009 image
  • Building “D&E” South Side Exterior - Jun2009 image
  • Building “A” Corridor Carpet - Jun2009 image
  • Building “E” North Side Finger Windows & Stucco Sheathing - May2009 image
  • Building “B” West Side Stucco Color Finish - May2009 image
  • Building “E” South Side Garden Terrace Concrete Construction - May2009 image
  • Building “A” Lobby Finishes - May2009 image
  • Building “A&B” Seismic Joint #11 Structural Steel Construction - May2009 image
  • SCE Electrical Transformer Cable Termination at Building “F” - May2009 image
  • Building “D” South Side Stucco & Color Finish - May2009 image
  • Building “A” Resident Bedroom Closet & Entrance Doors - May2009 image
  • Site Work - Loading Dock & Retention Basin South of Bldg “D” - Apr2009 image
  • Electrical Equipment at Bldg “F” - Apr2009 image
  • Building “B” East Side Stucco - Apr2009 image
  • Building “A” Resident Room Wall & Electrical Finishes - Apr2009 image
  • Fire Water Pump at Bldg “F” - Apr2009 image
  • Building “A” Resident Bathroom - Apr2009 image
  • Building “D” South Side Plaster Lath - Apr2009 image
  • Building “A” Corridor Wall Finishes - Apr2009 image
  • Site Development Work Loading Dock Construction at Bldg “D” - Mar2009 image
  • DWP Water Valves & Meters - Mar2009 image
  • Overall Building Structure:  West Section “C” thru “D” - Mar2009 image
  • Bldg “E” 4th Floor Garden Terrace Slab Placement - Mar2009 image
  • Site Development DWP Water Vault & Meter Installation - Mar2009 image
  • Bldg “A” Resident Bathroom - Mar2009 image
  • View of Buildings “D”, “E” & F from Bringham - Mar2009 image
  • View of Buildings “C”, “D” & E from MacArthur - Mar2009 image
  • Site Development Work Loading Dock at Bldg “D” - Feb2009 image
  • Bldg “D” Roofing and Chiller Piping - Feb2009 image
  • Overall Building Structure: West Section “C” thru “D” - Feb2009 image
  • Bldg “E” 3rd Floor Garden Terrace Slab Construction - Feb2009 image
  • Bldg “F” Mechanical Equipment Placement - Feb2009 image
  • 1st Floor Corridor Bldg “A” to Bldg “B” - Feb2009 image
  • Overall Building Structure: East Section “D” thru “E” - Feb2009 image
  • Bldg “D” Lobby Interior Construction - Feb2009 image
  • Bldg “A” Terrace Sun Screen Construction - Jan2009 image
  • Bldg “B” East Side Exterior Sheathing Installation - Jan2009 image
  • Overall Building Structure:  West Section “C” thru “D” - Jan2009 image
  • Bldg “E” Glass-Fiber-Reinforced-Concrete (GFRC) Erection - Jan2009 image
  • Bldg “F” Wall & Roof Construction - Jan2009 image
  • Bldg “A” Corridor Drywall Installation - Jan2009 image
  • Overall Building Structure:  East Section “D” thru “E” - Jan2009 image
  • Bldg “D” Lobby Front Exterior  Sheathing Installation - Jan2009 image
  • Bldg “A” Chiller Water Service & Return Piping Installation - Dec2008 image
  • View of Bldg “A, B & C” North Sides - Dec2008 image
  • Overall Building Structure:  West Section “C” thru “D” - Dec2008 image
  • Bldg “A” Bedroom Drywall Installation - Dec2008 image
  • Bldg “C” Roof Cellcrete Placement - Dec2008 image
  • Bldg “B” Exterior Sheathing Installation - Dec2008 image
  • Overall Building Structure:  East Section “D” thru “E” - Dec2008 image
  • Bldg “F” Wall & Roof Construction - Dec2008 image
  • Site Domestic Water Main from Bldg “F” to DWP point-of-connection - Nov2008 image
  • View of Bldg “A, B & C” East & North Sides - Nov2008 image
  • Bldg “A” Interior Framing & Wall Insulation - Nov2008 image
  • Overall Building Structure: West Section “C” thru “D” - Nov2008 image
  • Bldg “A” Roof Water Proofing & HVAC Equipment Installed - Nov2008 image
  • Bldg “B” Curtain Wall Window Installation - Nov2008 image
  • Bldg “F” Wall & Roof Construction - Nov2008 image
  • Overall Building Structure: East Section “D” thru “E” - Nov2008 image
  • Site Electrical Power Conduit from Building “F” to “D” - Oct2008 image
  • Bldg “A” Window Curtain Wall Construction - Oct2008 image
  • Overall Building Structure: West Section “C” thru “D” - Oct2008 image
  • Bldg “D” Basement Slab-On-Grade Construction - Oct2008 image
  • Bldg “A & B” West Side Exterior Construction - Oct2008 image
  • Bldg “F” Concrete Masonry Unit Wall Construction - Oct2008 image
  • Overall Building Structure: East Section “D” thru “E” - Oct2008 image
  • Bldg “D” Roof Concrete Placement - Oct2008 image
  • Bldg “C” Fireproofing, Interior Framing, Mech & Plumbing Rough-in - Sep2008 image
  • Bldg “F” Slab-On-Grade Completion - Sep2008 image
  • Overall Building Structure: West Section “C” thru “D” - Sep2008 image
  • Bldg “A” Glass-Fiber-Reinforced-Concrete (GFRC) Panels & Windows - Sep2008 image
  • Site Electrical Ductbank Behind South Retaining Wall at Bldg “E” - Sep2008 image
  • Overall Building Structural Steel Topping Out Ceremony at Bldg “E” - Sep2008 image
  • Overall Building Structure: East Section “D” thru “E” - Sep2008 image
  • Bldg “D” Ground Level Deck Placement - Sep2008 image
  • Building “A” Interior Framing, Mechanical & Plumbing Rough-in - Aug2008 image
  • Building “F” Structural Steel Erection - Aug2008 image
  • Overall Building Structure: West Section “A” thru “D” - Aug2008 image
  • Building “A” Lifting Glass-Fiber-Reinforced-Concrete (GFRC) Panel - Aug2008 image
  • Building “E” Structural Steel Erection - Aug2008 image
  • Building “B” Roof Equipment Pad Construction - Aug2008 image
  • Overall Building Structure: East Section “D” thru “E” - Aug2008 image
  • Building “A” Placed Glass-Fiber-Reinforced-Concrete (GFRC) Panels - Aug2008 image
  • Building “A” Roof Concrete Placement - Jul2008 image
  • Building “B” Second Floor Concrete Placement - Jul2008 image
  • Chilled Water Underground Pipe Installation at West Access Road - Jul2008 image
  • Building “D” South Basement Wall Framing - Jul2008 image
  • Building “A” First Floor Steel Structure Fireproofing - Jul2008 image
  • Building “F” Stem Wall Concrete Placement - Jul2008 image
  • Building “E” Slab-On-Grade Construction - Jul2008 image
  • Building “D” Structural Steel Erection - Jul2008 image
  • Building “E” Foundation Placement - Jun2008 image
  • Building “F” Foundation & Footing Construction - Jun2008 image
  • Chilled Water Underground Pipe Installation at West Access Road - Jun2008 image
  • Building “D” South Basement Wall Framing & Retaining Wall Block - Jun2008 image
  • Building “C” Structural Steel Erection - Jun2008 image
  • Building “A” 2nd Floor Decking Construction - Jun2008 image
  • Building “D” Basement Under-Slab-On-Grade Electrical Conduit - Jun2008 image
  • Building “A” 2nd Floor Deck Concrete Placement - Jun2008 image
  • Building “D” Basement Wall Waterproof Placement - May2008 image
  • Building “D” Retaining Wall Backfill - May2008 image
  • Building “A” Steel Stair & Decking Installation - May2008 image
  • Building “E” Slab-On-Grade Construction - May2008 image
  • Building “D” West Basement Wall Construction - May2008 image
  • Building “F” Underground MEP Installation - May2008 image
  • Building “B” Structural Steel Erection - May2008 image
  • Building “D” Basement Wall Backfill - May2008 image
  • Building “D” Foundation Concrete Placement - Apr2008 image
  • Building “D” Basement Wall Initial Concrete Placement - Apr2008 image
  • Building “F” Underground Utility Installation - Apr2008 image
  • Building “E” Foundation and Retaining Wall - Apr2008 image
  • Building “D” Basement Wall Rebar Placement - Apr2008 image
  • Building “B” Foundation Backfill for Slab-On-Grade - Apr2008 image
  • Building “A” Structural Steel Erection - Apr2008 image
  • Building “C” Slab-On-Grade Construction - Apr2008 image
  • Building “B” Foundation Concrete Placement - Mar2008 image
  • Fabrication of GFRC Exterior Panels (Front) - Mar2008 image
  • Building “E” Foundation Excavation - Mar2008 image
  • Placement of Building “A” Slab-On-Grade Rebar - Mar2008 image
  • Building “C” Foundation Rebar Placement - Mar2008 image
  • Fabrication of GFRC Exterior Panels (Back) - Mar2008 image
  • Building “D” Foundation Construction - Mar2008 image
  • Concrete Placement of Loading Dock Retaining Wall - Mar2008 image
  • Building Section “A” Foundation Rebar Installation - Feb2008 image
  • Building Section “A” Foundation Initial Concrete Placement - Feb2008 image
  • Building North Perimeter 10” Fire Water Line Installation - Feb2008 image
  • Building Section “A” & “B” Foundation Construction - Feb2008 image
  • Building Section “A” Foundation Anchor Bolt Installation - Feb2008 image
  • Building Section “A” Foundation Initial Concrete Placement - Feb2008 image
  • Bldg Section “D” Foundation & Retaining Wall Footing Excavation - Feb2008 image
  • Building Area “D” Retaining Wall Footing Rebar - Feb2008 image
  • Main Electrical Feed Underground down Constitution Completed - Jan2008 image
  • Building Section “D” Over-Excavation & Pad Certified Completed - Jan2008 image
  • Main Electrical Conduit Trench & Installation off Bonsall Avenue - Jan2008 image
  • Building Section “A” Foundation Excavation Rain Impact Clean-up - Jan2008 image
  • Building Section “A” Foundation Excavation Completed - Jan2008 image
  • Main Underground Electrical Conduit at Building Pad Section “E” - Jan2008 image
  • Building Section “A” Foundation Excavation Impact Caused by Rain - Jan2008 image
  • Site’s Main Sewer & Storm Drain Line City Point-of-Connection - Jan2008 image
  • Relocation of VA Steam Line into Building #337 - Dec2007 image
  • Project South View of Building Pad Section “A” - Dec2007 image
  • Trench & Installation of West Side Main Sewer Line - Dec2007 image
  • Building Section “F” Over-Excavation & Re-compaction - Dec2007 image
  • Building Section “E” Pad Graded & Certified - Dec2007 image
  • Mechanical Steam & Chiller Piping in Bldg Pad  Section “A” - Dec2007 image
  • Installation of Underground Electrical in Building Pad Section “C” - Dec2007 image
  • Site Power Underground Counduit Line in Constitution Ave. - Dec2007 image
  • Building Section “A” Finger’s Over-Excavation of Un-compacted Fill - Nov2007 image
  • Trench Excavation for the Re-route of the VA Steam Pipe - Nov2007 image
  • Installation & Welding of Jacketed Steam Pipe for the Re-Route - Nov2007 image
  • Building Section “E” Over-Excavation - Nov2007 image
  • Building Section “A” Re-compaction of Structural Fill - Nov2007 image
  • Installation of Hot Tap for the Re-Route of the VA Steam Pipe - Nov2007 image
  • Delivery of Building Foundation’s Anchor Bolts - Nov2007 image
  • Building Section “E” Re-compaction of Structural Fill - Nov2007 image
  • VA 12” Water Pipeline Loop installation along Vandergrift Ave. - Oct2007 image
  • Water Pipe Removal - Oct2007 image
  • Building “A” Foundation Over-excavation to Native Soil Depth - Oct2007 image
  • Building “A” Foundation Structural Fill Up to 375' @ Building Arc - Oct2007 image
  • VA Strom Drain & 12” Water Pipe backfilled along McArthur Ave. - Oct2007 image
  • Bore Testing for Native Soil Depth - Oct2007 image
  • Building “A” Foundation Structural Fill Density & Moisture Test - Oct2007 image
  • Buildings “C” thru “E” Rough Grading Completed - Oct2007 image
  • Water Tie-in to Police Station - Sep2007 image
  • 24 inch North Storm Drain and Manhole - Sep2007 image
  • North Nimitz Site Area Grading - Sep2007 image
  • Northwest Site Earthwork - Sep2007 image
  • West Road Cut and Grade - Sep2007 image
  • Site Soil Export - Sep2007 image
  • Northwest Site Area Earthwork - Sep2007 image
  • North 18 inch Storm Drain Installation - Sep2007 image
  • Trailer Complex - Aug2007 image
  • Building 265 Demo - Aug2007 image
  • South Site Earthwork - Aug2007 image
  • Water Line Across Site - Aug2007 image
  • Building 262 Lead/Asbestos Abatement - Aug2007 image
  • Northwest Site Earthwork - Aug2007 image
  • Southwest Water Line @ B337 - Aug2007 image
  • Buildings 265, 266 & 267 Demo Complete - Aug2007 image
  • Filled Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
Bldg-E 3rd Floor Terrace Planters with Soil in Place - Jan2010 image

If you have any questions or concerns regarding construction,
please call the information line at (310) 651-5066, or email wlavh@communityspeakup.com